Company introduction:Â
 Hangzhou Debao Electromechanical Manufacturing Co,. Ltd was founded in 2003. It's a professional manufacturer in communication tower, electrical tower, galvanizing process and decorative antenna and so on. With 163.8 million RMB registered capital and 700 employees, Debao has become the largest hot-dip galvanizing production base around East China( total 780 tons production capacity). Also, it is the manufacturing base of Zhejiang University Chemistry Laboratory galvanizing products and enterprise credit AAA company with ISO certificate.Â
 We have 10000 square meter office building and 46000 square meter workshop equipped with high-level production lines for communication tower and hot-dip galvanizing, which constitute a strong guarantee for the company's high operation efficiency. Per market demand, Debao launched a series of landscaped tower, bionic tower, decorative antenna, portable mobile base station, which have been widely used by operators now.
Qualification:
Business license, tax registration certificate and organization code certificate, quality management system, occupational health management system, environmental management system, enterprise credit AAA.Â
Construction Process:
1.Raw material inspectionÂ
Check steel specification, grade and heat number when coming, and then send sample to the laboratory for testing. Welding material needs re-rest of welding; Purchased tower attachments also need retest. Any non-conforming material should be avoided to enter into the production line.
2.Mark sample number
After sample plate and rod made, all the samples need to be approved by customers, then reviewed and marked number. Marked number with digital control, steel tower needs to retain head margin when cutting according to process requirement, diameter of both tube ends need the conformance with matching welding tube. The deviation is not more than ± 1.5D/1000, the total height deviation is no more than H/1500.
3.Rolling tube
After marked number and qualified, then turn to roll tube. To keep the ellipticity of the sheet plate, rolling on rolling machine where roller can move horizontally, then weld the connecting line and recheck. Visual inspection after rolling, the roundness should not exceed 3mm.
4.Welding
After tube bending, inspection and approval, it goes to automatic welding. Before welding, bevel angle is 25 degrees, also welding edge needs removing rust, burrs and dirt, electrode must be dried, coating drops or rust core are not allowed, and damp solder is also not allowed. Clean each welding line and inspect, then re-weld after clear defects. After welding slag and spatter need to be cleaned up. Select T-joints and 20% nearby welding line on main tower UT test to achieve GB11345-1989BII.
5.Flange installation
The flange needs automatic welding and UT test qualified. After installation and appearance inspection, inspect the angle dimension, so as to make sure the tower get installed smoothly.
6.Test assembly
Each section of the tower needs assembly test. The technical department will make a complete inspection, including the welding line mechanical property, the tower dimensions (length deviation, connection flatness and straightness, tower tube ovality, tube diameter deviation) must comply with requirement before turning to next stage.
7.GalvanizingÂ
After tower assembly test galvanizing will apply. Hot dip galvanizing coating thickness needs 86um
8.Inspection after galvanizingÂ
Test assembly again after galvanizing qualified, and the requirements are the same with previous test assembly. If there is deviation it needs correction, then turn to next stage.
9.Painting
Grinding zinc coating by sand blasting or abrasive paper to make the surface flatness and smoothness but not to damage zinc coating, then spay 6 layers painting to make sure the tower's service life.
Specification
Avaivable Height: | 5-100M |
Wind Pressure: | 5-180 KM/H |
Material: | Q345B/A572,minimum yield strength >=345N/mm2; Q235B/A36,minimum yiled strenght>=235N/mm2; |
Galvanized: | Hot Dip Galvanization |
Delivery Lead Time:Â | 25 Days after receiving 30% Deposit |
Lifetime: | Minimum 25 years |
Working &Â Resting Platform Quantity: | 1-3 PCS |
Working &Â Resting Platform Quantity: | 3-18 PCS |
Antenna Support Quantity : | 3-18 PCS |
MOQ: | 1 Set |
 |  |
Performance standard:
Besides conforms to the drawing and design, the materials and fabrication of tower components shall conform to the following standards (Chinese standards DL/T 646-2006 manufacturing technical requirements for transmission and substation and steel tubular structures) and customer's requirements
Welded requirements:
We used CO2Â welding and submerged arc auto welding or other methods
Welded seam shall be full penetration and grinded
The welded product has no fissure, scar, overlap, layer or other defects
Galvanization:
All components are hot-dip galvanized with uniform
Your inquiry is welcomed, if you have any other question, please let us know, we will do our best to supply the info as soon as possible
Gas Vortex Flowmeter adopts advanced differential technology, combined with isolation, shielding, filtering and other measures to overcome the similar products poor shock resistance, small signal data disorder and other problems, and adopts unique sensor packaging technology and protective measures to ensure the reliability of the product.
There are two types of products: basic type and compound type, the basic type measures a single flow signal; The composite can measure temperature, pressure and flow at the same time. Each type has an integral and separate structure to adapt to different installation environments.
Gas Vortex Flowmeter,Precession Vortex Flowmeter,Steam Superheater Flowmeter,Vortex Compressed Air Flow Meter
Kaifeng Chuangxin Measurement & Control Instrument Co., Ltd. , https://www.kfcxflowmeter.com